A road is widened to relieve congestion. Within a few years, the traffic is back.
The engineering was sound. The new lanes carry exactly what they were designed to carry. What changed was the system around them. Cheaper travel time drew more trips from existing residents, more freight, and new residents. In 2011 Gilles Duranton and Matthew Turner measured this across US cities and found that vehicle-kilometres travelled on interstate highways rose roughly in proportion to the lane-kilometres built. Adding capacity did not reliably reduce congestion. It produced more traffic.
Induced demand is not news to transport engineers. It has been described for decades. The interesting question is why the intervention keeps being chosen anyway. Capacity is a variable a design process can hold: it can be specified, costed, built and verified on opening day. The response of a whole city to that capacity is diffuse, slow and hard to attribute. One of them fits the shape of an engineering project. The other does not.
Nancy Leveson made a version of this argument about safety. Accident models built as chains of component failures, she wrote, cannot account for many accidents in complex systems, which arise from interactions between components that each work as specified, and from the control and organisational structure around them. A component is the unit an engineer is handed. The system is where the outcome is decided.
This essay follows that gap backwards: from engineering, through business, funding and the laboratory, to the place where it begins, which is the way attention is allocated in the first place.